✕
Search The Business Stories
Thursday, November 26, 2026
𝕏
in
yt
ig
Business Stories

INDUSTRY THOUGHT LEADERSHIP

P
November 26, 2026  ·  4 min read
INDUSTRY THOUGHT LEADERSHIP

Rajat Sharma on Why Delhi NCR Manufacturers Should Plan Packaging for the Season, Not the Order

RAJAT SHARMA

Aero Packaging / CRK Containers Pvt. Ltd., New Delhi

Rajat Sharma, Aero Packaging / CRK Containers Pvt. Ltd.

On 6 November 2026, the Commission for Air Quality Management invoked Stage III of the Graded Response Action Plan (GRAP) across Delhi-NCR with immediate effect. Eleven days later, on 17 November, it was revoked, while Stages I and II stayed in force. For factories in the region, the pattern is familiar: winter rules arrive overnight and can lift just as quickly. Rajat Sharma, the second-generation corrugated box manufacturer behind Aero Packaging in New Delhi, believes one item is routinely left out of that planning. When deliveries tighten, the smallest line on the bill of materials can be the one that stops dispatch: the box.

A box maker’s view of the production line

Rajat Sharma makes printed and plain corrugated boxes for organised manufacturing companies, the kind of businesses that run production lines and ship to schedules. The business began in 1986, when his father started it as a side venture before taking it up full-time. Sharma is building its next chapter, which includes CRK Containers Pvt. Ltd., set up in 2023.

His view of packaging is operational rather than cosmetic. A finished product cannot leave the plant without its outer carton, so a late or weak box holds back everything that has already been made. That is why he treats packaging as a question of trust before it is a question of rate. Speaking to Packaging South Asia in January, he put the standard he holds the business to plainly: “we never ever let our customers down.”

Why winter turns packaging into a planning problem

Delhi-NCR’s winter rules now follow a predictable season but an unpredictable calendar. Stage I came into force on 21 October, Stage II on 2 November and Stage III four days later. Separately, vehicles registered outside Delhi that do not meet BS-VI norms face entry restrictions from 1 November 2026 to 31 January 2027, with exemptions for electric, CNG and other notified categories. Under Stage IV, the strictest level, truck entry into Delhi is stopped except for essential goods and services, though CNG, LNG, electric and BS-VI diesel trucks are allowed.

Sharma’s argument is that most packaging plans are built for a normal week. Boxes are ordered close to need, delivered the next day and used almost at once. That works until a restriction changes which vehicle can move, or which route it must take. In a season like this, a dispatch plan that depends on the next truck is fragile.

He also cautions against the obvious fix of simply stocking more. Corrugated board absorbs moisture, and damp air, fog and cold floors reduce a box’s stacking strength over time. Buffer stock kept against a wall or directly on the floor can turn a delivery risk into a quality risk. Extra boxes help only when they are stored off the floor, kept dry and used in the order they arrived.

How Aero Packaging approaches the season

As a corrugated box manufacturer in Delhi-NCR, Aero Packaging operates from Nangli Sakrawati on Najafgarh Road in New Delhi and makes printed and plain corrugated boxes for industrial buyers. In January 2026, trade publications reported that the unit had installed a Robus India Confidence Series MHC-1300F, a heavy-duty automated die-cutting machine built for cutting and creasing corrugated board. For buyers of die-cut boxes, that kind of automation supports repeatable output across longer runs, which matters when a season’s requirement is produced in planned batches rather than urgent lots.

The conversation Rajat Sharma recommends is a practical one. Early in the season, a buyer should share expected packaging volumes for November to January by product, agree on scheduled call-offs in place of last-minute orders, and ask the supplier which vehicles it dispatches on and what its fallback is if stricter stages return. The answers show whether a supplier can keep a line running through the winter.

Plan for the season, not the order

Air-quality restrictions are now a fixed part of Delhi-NCR’s industrial calendar, and they are unlikely to become more predictable. Sharma’s suggestion for owners and production heads is to treat packaging the way they already treat raw material: forecast it, schedule it and store it properly.

A production line can absorb many delays. It cannot dispatch without a box. For Rajat Sharma, packaging that arrives on time and holds its strength through the season is where a manufacturer’s reliability is tested first, long before the customer sees the product.

INDUSTRY THOUGHT LEADERSHIP
Related Stories
You might also like